Video: Flipping Two Parts of a Large Proton Therapy Systems

This cool video shows an operation by the Logistics Plus Belgium team in Antwerp. We have been involved in a larger project involving the transport and delivery of two large (7 x 4 x 4 meter, 29 metric ton) proton therapy systems to a hospital in Manchester. Since there would be no space to reposition this equipment correctly at the final delivery site, we had to flip them at the port; but in a controlled way of course. So that’s how you flip it!