Project-Cargo-Portfolio-ThumbnailThe Logistics Plus project cargo portfolio includes examples from around the world.

Project cargo, project forwarding, heavy lift – call it what you will. Our project cargo specialists have managed big and unique cargo freight projects around the world. The examples below illustrate current cargo projects we have handled. You can also click the image to the right to view a PDF document with many other projects we have handled. Contact us today if you’re ready for us to manage project cargo for you too!

(Note: Click the photo thumbnail to the left of each project to a view larger size image)

Project Name: 200 Ton Stator
Photo Start End Origin Dest Terms Mode Freight Max DIMS
(LWH, Kgs)
01/18/2016 03/03/2016 Poland Turkey FOT BBK 248 7.07*3.85*4.7 200 Tons
Logistics Plus Turkey, safely delivered 200 TON Stator from Gdynia to Yatagan Thermal Power Plant , Mugla/Turkey.

 

Project Name: Three Generators
Photo Start End Origin Dest Terms Mode Freight Max DIMS
(LWH, Kgs)
Generators-CN-US-GIF 11/24/2016 11/28/2016 China USA DDP BBK 279.8 5.2*5.1*3.5 M 3 Units
Received 3 Generators in Philly, load out on Barge, deliver to Providence RI.

 

Project Name: Heavy Gas Turbine
Photo Start End Origin Dest Terms Mode Freight Max DIMS
(LWH, Kgs)
Gas-Turbine-Project-BEtoCN-GIF 11/5/2016 12/16/2016 Belgium China EXW / CFT BBK 313 9,90×3,64xf,69m lwh,95mt
Pick up 94mt heavy gas turbine from storage area in Antwerp, load to barge, shift to outgoing terminal and load on container vessel for breakbulk shipment by floating crane.

 

Project Name: DECK HOUSE
Photo Start End Origin Dest Terms Mode Freight Max DIMS
(LWH, Kgs)
Deck House from China to USA 11/20/2016 12/24/2016 China USA FOB Qidong – Free out Portland BBK 696 12,89×10,97×4,92m lwh, 120mt
Receive deck house on barge at supplier facility, ship to Shanghai, transfer to heavy lift vessel and ship to Portland on last in / first out basis.

 

Project: Turbines
Photo Start End Origin Dest Terms Mode Freight Max DIMS
(LWH, Kgs)
Vestas from NL to Finland 11/1/2016 12/28/2016 Netherlands Finland EXW Eemshaven – Free out Pori BBK 5244 12,20×3,60×4, 12m lwh, 82mt
Dismantle, truck and ship 2 complete vestas V90 turbines from site in Eemshaven to free out Pori, Finland.

 

Project: Water Treatment Modules
Photo Start End Origin Dest Terms Mode Freight Max DIMS
(LWH, Kgs)
Wastewater modules UK to Singapore 9/12/2016 10/2/2016 UK Singapore EXW-DAP OOG 498 10, 2 x 2, 89 x 2, 8m lwh, 7, 3mt
Shipment of 11 modules of a wastewater treatment facility from workshops in UK up to discharged on site Jurong wastewater treatment plant.

 

Project: Wind Towers
Photo Start End Origin Dest Terms Mode Freight Max DIMS
(LWH, Kgs)
18 windtowers from EXW to UK May 2016 June 2016 Turkey Singapore EXW Bergama – FOT Southampton Breakbulk 4072 23,2×3,76×3,96m lwh, 30,5mt
Shipment of 18 wind tower sections by geared vessel from EXW factory to discharged on trailer Southampton.

 

Project: Rotor & Blower Rotors
Photo Start End Origin Dest Terms Mode Blower Rotors Rotor Fuji
Fuji Rotor & Blower Rotor Indonesia to Romania May 2016 June 2016 Purwakarta,
Indonesia
Bucharest,
Romania
Door-to-Dor Ocean Freight + Inland Transport 27,220 kg 58,000 kg
Movement of Blower Rotors B-5101 & Flat rack from PT Sulzer Turbo Services Indonesia Workshop to General Turbo – Romania and returned to Formosa Petrochemical Corporation – Taiwan. Door to Door Services of Rotor (Steam Turbine Rotor) from Indonesia Workshop to General Turbo – Romania Vise Versa.

 

Project: Cargo
Photo Start End Origin Dest Terms Mode Freight Max DIMS
(LWH, Kgs)
Cargo BE to China2 March 2016 June 2016 Antwerp, Belgium Shanghai, China c+f Shanghai 1 x 40′ FR OOG + 2 x 40′ HC 31 OOG 6.55 x 3.94 x 3.58 m lwh, 18.1mt
Collection of cargo from Sweden /Switzerland/ France/ Norway for  temporary storage . Then  stuffing on Flat and into  2x 40’ HC for shipment to Shanghai.

 

Project: Thrusters
Photo Start End Origin Dest Terms Mode Freight Max DIMS
(LWH, Kgs)
???????????????????????????????????? 2/2/2016 2/19/2016 Finland Romania FCA-DAP Ocean Freight 350 cbm 10 x 3.9 x 4.6 meters, 49,000 kgs
2 thrusters of 49mt each had to be delivered urgently from Rauma, Finland to Tulcea, Romania. Logistics Plus Belgium managed to arrange this transport in 17 days by RORO and barge.

 

Project: Blades
Photo Start End Origin Dest Terms Mode Freight Max DIMS
(LWH, Kgs)
Windmill-Blades-Germany-to-USA May 2016 August 2016 Rostock, Germany Ithaca, MI USA DAP Coaster – Ocean Vessel – Truck 1300 frt 2 x 57, 80 x 3, 22 x 3, 30 m
Movement of 2 spare blades from free in Rostock via Bremen to DAP Ithaca via Monroe, MI. After 50 years first non-US vessel arriving at Monroe port. Challange: Draft at Monroe, space at pier, turn out of port with ~60 m long cargo. Return of 2 damaged blades from Ithaca, MI to Rostock, DE & Aalborg, DK via Monroe and  Antwerp.

 

Project: Pipes
Photo Start End Origin Dest Terms Mode Freight Max DIMS
(LWH, Kgs)
 Coated Steel Pipes from Germany to USA June 2015 September 2015 Bremen, Germany Massillon, OH USA DAP pipe yard MPP-vessel, truck Coated Steel Pipes 18 m x 0, 914m, abt. 9 mts
Logistics Plus Inc was contracted by its JV partner Carl Polzin – specialized on logistic projects for the line pipe industry – to transport 40,000 FRT of coated steel pipes from several Erie Lake ports to the final pipe yards in Ohio and Michigan. All trucks were equipped with the System 88 solution to ensure a safe pipe transport. Flawless just-in-sequence deliveries and a high quality level of the logistic processes convinced all involved parties of the involved logistic partners.

 

Project: Windpower Turbines
Photo Start End Origin Dest Terms Mode Freight Max DIMS
(LWH, Kgs)
 Wind-Turbines-China-to-Finland 3/24/2015 6/29/2015 China Finland Door-to-Door Ocean Freight 2,640 freight tons 49.5 x 2.88 x 3.337 meters,41.000 kgs
Delivery of all main components for 3 windpower turbines to Finland. Blades from Jiangyin China, hub/nacelle/generator/base frame from Wekerom, Netherlands. See finished product video here.

 

Project: Tanks
Photo Start End Origin Dest Terms Mode Freight Max DIMS
(LWH, Kgs)
 Gas-Tanks-to-Brazil 3/20/2015 upcoming China Brazil FOB Qidong – installed Suape Breakbulk 17,390 26340 x 12410 x 13300 meters,
339.000 kgs
2 shipments of each 2 tanks, loaded on barge in Qidong, stored ‘under BLZ regime’ in Jiangyin, shipped to Suape installation direct from vessel to hull.

 

Project: Windmill Generators
Project Start End Origin Dest Terms Mode Freight Max DIMS
(LWH, Kgs)
 Windmill-Generators 5/15/2012 ongoing China U.K. EXW Jinhua – hook Southampton Breakbulk 3,255 5700 x 5700 x 2850 meters, 31.000 kgs
regular shipments of windmill generators, approximately 120 units per year